An Economic Analysis of 8 Megawatts Solar Power Plant Between the Solar Cell Panel Arrangement Method and Non-Arrangement Method
Main Article Content
Abstract
According to the Electricity Generating Development Plan, 2018 an opportunity on the investment of new power plant construction (56,431 megawatts). Regarding renewable energy, there was a ten-year project in 100 megawatts solar power. The design of solar power plant everywhere would have power loss in the electricity generating system which included controllable and uncontrollable systems. Solar panel arrangement could reduce power loss in solar power plant. This research use data of 8 Megawatts solar power plant to analysis the voltage from the manufacturer (30,800 modules all the plant). Arrangement voltage nearby of solar panels making the electricity generating system was better than that of the non-arrangement. The difference in voltage and current of the whole project was 2.22 volt and 0.66 Ampere, resulted in the highly difference in each string and power loss in the electricity generating system (1.28% increase). Based on an economic analysis of the two types of solar power plants based on NPV at 3% discount rate, it was found that both types had a positive NPV. This denoted that it was worthwhile for the investment. For B/C ratio and internal returns rate it was found that the solar power of arrangement had a bit better worthiness (B/C ratio = 1.13 and 1.06; IRR= 3.86% and 3.38%, respectively). For the sensitivity analysis of the investment costs arrangement solar power panel, it was more worthwhile in the investment.
Article Details

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Articles published in Journal of Industrial Technology Ubon Ratchathani Rajabhat University both hard copy and electronically are belonged to the Journal.
References
Energy Policy and Planning Office. Ministry of Energy. Power Development Plan 2018-2037. [Internet]. No date [cites 2019 May 16] available from: https://www.eppo.go.th/images/Infromation_ service/public_relations/PDP2018/PDP2018.pdf (in Thai)
Sakchaiwattana Sutont, Somthawin Khunkhet, Kamon Jirasereeamornkul, Wanchak Lenwari, Sermsuk Buochareon and Yingrak Auttawaitkul. Comparison of 1 MW Solar Power Plants with "Arranging Solar Panels "and "Without Arranging Solar Panels". The 6th International Conference on Sustainable Energy and Green Architecture. 2017 August 30-31; Bangkok. Thailand. Kasertsart University; 2017. 69-73.
Yusufoglu U. A., Min B., Pletzer T. M., van Mölken J. I. and Kurz H. Simulation and analysis of PV module performance by innovative sorting methods. Energy Procedia. 2012; 27: 685 – 90.
Massi P. A, Tessarolo A, Barbini N, Mellit A, and Lughi V. The effect of manufacturing mismatch on energy production for large-scale photovoltaic plants. Solar Energy. 2015; 117: 282–9.
Kaushika N.D. and Anil K. R. An investigation of mismatch losses in solar photovoltaic cell networks. Energy. 2007; 32: 755–9.
Webber J. and Riley E. Mismatch Loss Reduction in Photovoltaic Arrays as a Result of Sorting Photovoltaic Modules by Max-Power Parameters. ISRN Renewable Energy. 2013; Volume 2013(9).
Thongsukowong A. Investment decisions. [Internet]. No date [cites 2019 May 16] available from: https://home.kku.ac.th/anuton/3526301/Doc_04.pdf (in Thai)
Ardalan A. Economic and Financial Analysis for Engineering and Project Management. Boca Raton: CRC Press; 2000.
Polchoosakolwong Y, Rukkan S, Seehomchai P and Jindawattana A. Feasibility study of solar power plant construction case study: Kudrang District, Maha Sarakham Province. Kasem Bundit Engineering. 2014; 1 (January-June): 41-57. (in Thai)