Production Process Improvement Using Lean Principles and a Production Monitoring System in a Beverage Bottling Plant: A Case Study
Keywords:
Lean principles, Deming cycle, Performance dashboard, Breakdown timeAbstract
This study aims to analyze and improve the production process of a beverage bottling plant by applying Lean principles in conjunction with the development of an integrated performance dashboard to reduce machine breakdown time. The improvement approach is based on the Deming cycle and employs Lean tools such as preventive maintenance 5S and standard work to identify and eliminate waste in the production process. Pareto analysis indicates that the most critical wastes affecting the process are defects and rework, followed by waiting time. These findings correlate with the breakdown analysis, which identifies the Crowner and Carton Sealer machines as critical bottlenecks with the highest accumulated downtime, together accounting for 44.58% of the total breakdown time. Root cause analysis using the Why–Why technique reveals that the primary issues stem from a lack of preventive maintenance, the absence of standardized work procedures, and operator behaviors. After implementing the Improvement measures, the breakdown time of the Crowner machine decreased by 94% from 0.82% to 0.047%, while that of the Carton Sealer machine decreased by 76% from 0.76% to 0.175%. The results demonstrate that integrating Lean principles with the Deming cycle and a production performance dashboard can effectively reduce breakdown time, enhance production efficiency, and establish a sustainable system of continuous improvement.
References
Bank of Ayudhya Public Company Limited, Thailand Industry Outlook 2025–2027: Beverage Industry, Bangkok: Krungsri Research, 2023. [Online]. Available: https://www.krungsri.com/th/research/industry/industry-outlook/food-beverage/beverage/io/beverage-2025-2027
Office of Industrial Economics (OIE) and Euromonitor International, Beverage Production and Consumption Trends in Thailand 2018–2027, Bangkok: Ministry of Industry, 2024.
K. K. Pajuelo Rojas, J. C. Quiroz-Flores and S. Nallusamy, “Minimization of product distribution delays through an integration model of lean manufacturing tools and A3 report-Case study,” International Journal of Mechanical Engineering, vol. 10, no. 9, pp. 31–43, Sep. 2023.
H. Ghelani, “Advances in lean manufacturing: Improving quality and efficiency in modern production systems,” International Journal of Scientific Research and Management, vol. 9, no. 6, pp. 611–625, Jun. 2021.
J. P. Womack and D. T. Jones, Lean Thinking: Banish Waste and Create Wealth in Your Corporation, New York: Simon & Schuster, 1996.
T. Ohno, Toyota Production System: Beyond Large- Scale Production, Portland, OR: Productivity Press, 1988.
J. Bhamu and K. S. Sangwan, “Lean manufacturing: Literature review and research issues,” International Journal of Operations & Production Management, vol. 34, no. 7, pp. 876–940, 2014.
M. - Á. Rangel- Sánchez et al., “Enhancing scrap reduction in electric motor manufacturing for the automotive industry: A case study using the PDCA ( Plan–Do–Check–Act) approach,” Applied Sciences, vol. 14, no. 2999, pp. 1–27, 2024.
V. Nguyen, N. Nguyen, B. Schumacher and T. Tran, “Practical application of Plan–Do–Check–Act cycle for quality improvement of sustainable packaging: A case study,” Applied Sciences, vol. 10, no. 6332, pp. 1–15, 2020.
N. Wapeetho, “Application of Lean concept to improve production efficiency in the mold parts department of ABC company,” Master's thesis, College of Commerce, Burapha University, Chonburi, Thailand, 2020.
S. Vilarinho, I. Lopes and S. Sousa, “Design procedure to develop dashboards aimed at improving the performance of productive equipment and processes,” Procedia Manufacturing, vol. 11, pp. 1634–1641, 2017.
F. Nunes, E. Alexandre and P. D. Gaspar, “Implementing key performance indicators and designing dashboard solutions in an automotive components company: A case study,” Administrative Sciences, vol. 14, no. 8, p. 175, 2024.
S. Rahman, “Theory of constraints: A review of the philosophy and its applications,” International Journal of Operations & Production Management, vol. 18, no. 4, pp. 336–355, 1998.
Z. T. Şimşit, N. S. Günay, and Ö. Vayvay, “Theory of Constraints: A literature review,”Procedia–Social and Behavioral Sciences, vol. 150, pp. 930–936, 2014.
D. A. de J. Pacheco, I. Pergher, J. A. V. Antunes Jr. , and G. L. R. Vaccaro, “Exploring the integration between Lean and the Theory of Constraints in operations management,” International Journal of Lean Six Sigma, vol. 10, no. 3, pp. 718–742, 2019.
J. V. R. Luiz, F. B. de Souza, and O. R. Luiz, “Theory of Constraints and Industry 4.0: mutual contributions and research perspectives,” Production, vol. 35, 2025.
S. Pawlak, “The impact of selected lean manufacturing tools on the level of delays in the production process: A case study,” Management Systems in Production Engineering, vol. 32, no. 1, pp. 103–107, 2024.
P. Peças, J. Encarnação, M. Gambôa, M. Sampayo and D. Jorge, “PDCA 4.0: A new conceptual approach for continuous improvement in the Industry 4.0 paradigm,” Applied Sciences, vol. 11, no. 7671, pp. 1–29, 2021.
S. Chinodom “Improvement of an assembly station using PDCA cycle and cross-functional team,” Engineering Journal of King Mongkut’s Institute of Technology Ladkrabang, vol. 39, no. 4, pp. 120–130, 2022.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2026 Faculty of Industrial Technology, Suan Sunandha Rajabhat University

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
บทความที่ได้รับการตีพิมพ์เป็นลิขสิทธิ์ของคณะเทคโนโลยีอุตสาหกรรม มหาวิทยาลัยราชภัฎสวนสุนันทา
ข้อความที่ปรากฏในบทความแต่ละเรื่องในวารสารวิชาการเล่มนี้เป็นความคิดเห็นส่วนตัวของผู้เขียนแต่ละท่านไม่เกี่ยวข้องกับมหาวิทยาลัยราชภัฎสวนสุนันทา และคณาจารย์ท่านอื่นๆในมหาวิทยาลัยฯ แต่อย่างใด ความรับผิดชอบองค์ประกอบทั้งหมดของบทความแต่ละเรื่องเป็นของผู้เขียนแต่ละท่าน หากมีความผิดพลาดใดๆ ผู้เขียนแต่ละท่านจะรับผิดชอบบทความของตนเองแต่ผู้เดียว

