Motion and Time Study: A Case Study on A Short-Time Hydrostatic Failure Pressure Testing Process of Rigid PVC Plain-End Pipes
Keywords:
Rigid PVC Plain-End Pipe, Motion and Time Study, Standard Time, Short-Time Hydrostatic Failure Pressure Test, Process Improvement, ECRS, Maytag Table, Time AllowancesAbstract
This research work is relevant to the application of motion and time study techniques with two key objectives of the study. The first is to determine standard time of the short-time hydrostatic failure pressure testing process of rigid PVC plain-end pipes which is a bottleneck on the production line in a case study factory. The second is to introduce a practical guideline for a new approach to working that are capable to shorten the cycle time of the testing process on the basis of ECRS four principles. The result of preliminary survey on the hydrostatic failure pressure testing process of the rigid PVC plain-end pipes indicated that operations of the testing process can be divided into 20 sub-tasks. To determine the standard time of the process, counting the timing of sub-tasks was carried out with 10 cycles each in order to use for calculating the optimal number of cycles by using the Maytag table at a 95% confidence level and accuracy of 5%. The result showed that the optimal number of timing cycles for all of 20 sub-tasks are not greater than 10, thus, the number of timing cycle of all elements were sufficient to satisfy the confidence and accuracy level. The average selected time and time allowances for each sub-tasks were then calculated and adjusted to obtain the individual standard times. The results from using ECRS principle for rendering process improvement have proved very effective in the new work method that not only could reduce the number of sub-tasks from 20 before the improvement to 16 after the improvement done, but also shortens the standard time from 978.16 seconds/piece (excluding the time required for failure pressure test with the hydrostatic pressure machine) down to 687.25 seconds/piece or cut down 290.90 seconds/piece which is 30% of the previous standard time.
References
Ann Hendrich, Marilyn Chow, Boguslaw A. Skierczynski, Zhenqiang Lu (2008). Hospital Time and Motion Study : How Do Medical Surgical Nurses Spend Their Time. The Permanente Journal Summer, 12(3). 25–34.
Ann Hendrich, Marilyn Chow, Boguslaw A. Skierczynski, Zhenqiang Lu 2008. A 36 – Hospital Time and Motion Study : How Do Medical Surgical Nurses Spend Their Time. The Permanente Journal Summer, 12(3). 25 – 34.
Barnes, R.M. Motion and Time Study Design and Measurement of Work. 7th ed. New York: John Wiley & Sons, 1980.
L. Aharonson Daniel (1996) Time Studies in A&E Departments-A Useful Tool for Management. Journal of Management in Medicine, Vol 10 No 3 Pages 15-22.
Rachavarn Kanjanapanyakom. (2009). The Study of Industry Project. (1st Edition). Bangkok : Top Publishing Co., Ltd.
Thai Industrial Standards Institute. Thai Industrial Standards (TIS) 17-2532 PVC Pipes Used for Drinking-water Pipes. Bangkok, 1989
Vanchai Rijiravanich. (2002). Study of Operation, Principles and Case Studies. (3rd Edition). Bangkok :Chulalongkorn University Press.
Watchanachai Joompha. (2003). The Study of Manufacturing Process and Investigating Ways to Increase Products of Medical Device Manufacturing.Thesis of Master of Industry, Mechanical Engineering King Mongkut's University of Technology Thonburi.
Watcharin Sitticharoen. (2004). Work Study. (1st Edition). Bangkok: Odian Store Press.
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2023 Faculty of Industrial Technology, Suan Sunandha Rajabhat University

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
บทความที่ได้รับการตีพิมพ์เป็นลิขสิทธิ์ของคณะเทคโนโลยีอุตสาหกรรม มหาวิทยาลัยราชภัฎสวนสุนันทา
ข้อความที่ปรากฏในบทความแต่ละเรื่องในวารสารวิชาการเล่มนี้เป็นความคิดเห็นส่วนตัวของผู้เขียนแต่ละท่านไม่เกี่ยวข้องกับมหาวิทยาลัยราชภัฎสวนสุนันทา และคณาจารย์ท่านอื่นๆในมหาวิทยาลัยฯ แต่อย่างใด ความรับผิดชอบองค์ประกอบทั้งหมดของบทความแต่ละเรื่องเป็นของผู้เขียนแต่ละท่าน หากมีความผิดพลาดใดๆ ผู้เขียนแต่ละท่านจะรับผิดชอบบทความของตนเองแต่ผู้เดียว