Study of the Use of Primavera P6 Computer Program for Planning and Cost Planning for Construction Project Management
Main Article Content
Abstract
This research aims to study the use of Primavera P6 program in planning the duration and cost of construction projects by analyzing the quantity of work, materials, labor and machinery from BOQ (Bill of Quantities) for planning and comparing costs. including using project performance indicators such as BCWP, BCWS, ACWP, CPI, SPI, CV, SV to assess the value and efficiency of the project from project simulation in 4 phases, found that 1. The project progressed 25%, BCWS value = 20,341,803.04 baht, SV value = -20,038,557.54 baht, CV value = -109,491,703.68 baht 2. The project progressed 50%, BCWS value = 33,980,146 baht, SV value = 6,180,297.5 baht, CV value = -108,137,343.72 baht 3. The project progressed 75%, BCWS value = 94,905,240.52 baht, SV value = 11,986,476.95 baht, CV value = -90,474,325.45 baht 4. The project progressed. 100% BCWS = 109,794,949.18 THB SV = 0.00 THB CV = -83,198,409.53 THB The results of this study show that Primavera P6 can help to make the planning and monitoring of construction projects more efficient by estimating the actual cost compared to the planned cost to improve the project management for maximum benefit.
Article Details
References
S. Jairtalawanich and T. Jairtalawanich, “A feasibility study of investment in rental housing development,” in Proc. Proceedings of the 6th PSU Engineering Conference,8-9 May. 2008. (in Thai).
S. Kanangkaew, et al., “Applying 5D-BIM to Improve the Quantity Takeoff: A Case Study of Educational and Laboratory Building Construction Project,” Sarasatr: Journal of Architecture and Design, vol. 7, no.1, pp.103-113, 2024. (in Thai).
N. Sasang and S. Kusalasai, “Scheduling Elevated Mass Rapid Transit Project using Repetitive Construction Approach: A Case Study of MRT Green Line Project Bearing - Samutprakan Section,” Ladkrabang Engineering Journal, vol. 34, no.3, pp.65-81, 2017. (in Thai).
C. Hansacharoonroj, et al., “Student’s Satisfaction in Learning Media Primavera 5.0 in RMUTR,” Modern Management Frontier Journal, vol. 8, no.2, pp.81–94, 2010. (in Thai).
S. Naseem, et al., “Project Planning, Scheduling, Tracking and Cost Control – A Case Study for Residential (G+4) Building by Using Software Primavera P6,” International Journal of Research and Analytical Reviews (IJRAT), vol. 5, no.3, pp.859–864, 2018.
K. M. Al-Subhi and A. S. Al-Harthy, “Evaluating Project Management Software Packages Using a Scoring Model—A Comparison between MS Project and Primavera,” Paper presented at the International Conference on Industrial Engineering and Operations Management (IEOM), Dubai, UAE, 2015.
Y. Kohking, (2024, Nov. 30). “Project planning and management with PRIMAVERA P6” [Online]. Available https://digital.se-ed.com/#!/detail/5522840320223/0/ (in Thai).
S. Kwan¬suksri, (2024, Nov. 30). “A study of construction project cost management using earned value analysis: A case study of a block rubber factory construction in Sakon Nakhon province” [Online]. Available https://e-research.siam.edu/wp-content/uploads/2021/10/M-Eng-2021-IS-A-Study-of-Construction-Project-Cost-Management-Using-Earned-Value-Analysis-new.pdf (in Thai).
P. Phainai, “Construction management,” Bangkok: Technology Promotion Association (Thailand–Japan). 2005 (in Thai).