Preventive Maintenance Case Study : Car Seat Manufacturing Company
Main Article Content
Abstract
The failure of machinery in the car seat production process is a main problem of industrial plants. Therefore, the researcher proposed the preventive maintenance method for improving the efficiency of the operation of machine. From the obtained data of the machine maintenance period, resulting in the production line being more efficient, and machine availability increased from 87.86% per month to 96.98% per month. Mean Time to Repair (MTTR) decreased by 121 hours per month to 57 hours per month. Mean Time Between Failures (MTBF) increased from 878.6 hours per month to 1,920 hours per month. The average value of losses decreased from 50,670 baht per month to 34,050 baht per month, when applying the preventive maintenance method in the car seat production line.
Article Details
References
Witthaya Inthornphairot, Pairote Duangnakhon and Pattama Pornthoru. Understand the Concept of Productivity Increase, Industrial Technology Review, pp. 278. 2016 (in Thai).
Kosol deeseentam, Credibility engineering for maintenance work Electrical techniques Mechanical Industry 28, pp. 102-109. 2011 (in Thai).
Atiwat Kiratiamonlak. The Setting of Preventive Maintenance System for Improving the Efficiency of Blow Moulding Machinery of Plastic Gallon and Plastic Bottle. The 7th National Conference on Technical Education, Thailand, 6-7 Nov 2014 (in Thai).
Modern Manufacturing, How to Reduce Downtime E-Book, 12 May 2017.
Suparachai Worarat and Suparachai Worarat. Reducing the defective rate of machinery Case studies of in-line maintenance work Manufacturing of jewelry and gems. Journal of Graduate Studies Dhurakij Pundit University 8, 1 pp. 1476- 1491. Aug-Nov 2019 (in Thai).
Wissarut Suwannatrai and Nuchsara Kriengkorakot. Development of a maintenance system for a medical packaging factory in Chachoengsao province. Academic Journal Engineering, PSU, Year 7, Issue 2, pp. 23-33, July - December 2014 (in Thai).
Kasem rungruang and Suparachai Worarat, Planning for preventive maintenance of machinery in relay industry, Thailand, Dhurakij Pundit University, 2009 (in Thai).
Nattakron Wisedsirikul, Yongyuth Lovanit and Weerasak Wongchan, “Plan total productive maintenace case each of Packsys Global (Thailand) Ltd,” Department of Industrial Management Technology Burapha University., 2011 (in Thai).
Jardaine, Andrew K.S, and Albert H.C. Tsang, Maintenance Replacement and Reliability Theory and Application, Boca Raton Florida: Taylor & Francis Group, 2006.
Danuphon Nana, “Reliability Centered Maintenance : a Case Study of Spray Dried Food Factory,” Department of Industrial Engineering and Management Silpakorn University, 2016 (in Thai).
Adisorn Saengchai, “Quality Improvement of the Counter Weight Production Process Case Study : Steeler Steel Works Co., Ltd,” Faculty of Business Administration Rajamangala University of Technology Thanyaburi, 2012 (in Thai).
G.A. Klutke; P.C. Kiessler; M.A. Wortman, A critical look at the bathtub curve. IEEE Transactions on Reliability. vol. 52 no.1, pp. 125–129, March 2003.