Cause of Delay in the Construction Project by Relative Importance Index Method

Main Article Content

Waranon Kongsong
Chaiwat Pooworarulchai

Abstract

The research aims to provide information for successful construction project management. There are a large number of variables that can affect project delays and disruptions. Previously the investigation focused on project overview while excluding project stakeholders. In other words, ongoing construction were not taken into consideration. In this study, the analysis was done in terms of overall and separate considerations on causality; thus stakeholders attitude towards the project can be separated. The causal group encompasses the owner group, designer and supervisor group, along with the contractor group. The data were gathered from representative engineers associated with the construction projects in Bangkok and its vicinity. Factors causing delays and disruptions were analyzed using Relative Importance Index (RII). As results, the most significant factors contributing to construction delays are labor shortage, construction mistakes and defective work for the contractor group, coupled with slow decision making for the designer and supervisor group. As for the owner or the contractor, the delay emerges from confused statement of work and late delivery of the construction site. In addition, lack of collaboration and swing relationships among stakeholders and lack of continuity of the work in its construction phases are major factors affecting delays on construction projects.

Article Details

Section
Engineering Research Articles

References

[1] V. Ajchayanonkit. (2013, July). Disputes in Construction. TTF international. Bangkok. Thailand [Online]. Available: http://www.buildernews.in.th/page.php?a=10&n=176&cno=5253

[2] G. Polat, F. Okay, and E. Eray, “Factors affection cost overruns in micro-scaled construction companies,” Procedia Engineering, vol. 85, pp. 428–435, 2014.

[3] R. F. Aziz, “Ranking of delay factors in construction projects after Egyptian revolution,” Alexandria Engineering Journal, vol. 52, no. 3, pp. 387–406, 2013.

[4] S. Lambropoulos, “Objective construction contract award using cost, time and durability utility,” in Proceedings 26th IPMA World Congress, Crete, Greece, 2012, pp. 123–133.

[5] F. Antoniou, G. N. Aretoulis, D. Konstantinidis, and G. P. Kalfakakou, “Selection criteria used for the choice of contract type for major highway construction projects,” in Proceedings Social and Behavioral Sciences, 2012, pp. 3508–3517.

[6] A. H. Aliza, K. Stephen, and T. Bambang, “The importance of project governance framework in project procurement planning,” in Proceeding Engineering, 2011, pp.1929–1937.

[7] C. pooworakulchai, W. Kongsong, and K. Kongbenjapuch, “The effects of government’s construction contract administration,” International Journal of Engineering Research and Management, vol. 3, no. 3, pp. 39–43, 2016.

[8] C. Pooworakulchai, W. Kongsong, and K. Kongbenjapuch, “Affecting on contract administration in government construction projects,” International Journal of Applied Engineering Research, vol. 12 no. 9, pp. 2079–2086, 2017.

[9] Ministry of Finance The Comptroller General’s Department Office of Government Procurement Standards. (2010). The number of vendors with government Sign in e-GP system. Thai Government Procurement, Bangkok, Thailand [Online]. Available: www.gprocurement.go.th

[10] L. Kish, Survey Sampling, John Wiley & Sons Inc., 1965

[11] M. M. Marzouk and T. I. El-Rasas, “Analyzing delay causes in Egyptian construction projects,” Journal of Advanced Research, vol. 5, no. 1, pp. 49–55, 2014.

[12] S. Punpinit, Research techniques in social science. Bangkok: Jun Publishing, 2004, pp. 191–193.

[13] S. S. S. Gardezi, I. A. Manarvi, and S. J. S. Gardezi, “Time extension factors in construction industry of Pakistan,” in Proceeding Engineering, 2014, pp. 196–204.

[14] L. Muhwez, J. Acai, and G. Otim, “An assessment of the factors causing delays on building construction projects in Uganda,” International journal of construction engineering and management, vol. 3, no. 1, pp. 13–23, 2014.

[15] N. M. Tawil, M. A. Khoiry, I. Arshad, N. hamzah, M. F. Jasri, and W. H. W. Badaruzzaman, “Factors contribute to delay project construction in higher learning education case study UKM,” Research Journal of Applied Sciences, Engineering and Technology, vol. 5, no. 11, 2013.

[16] A. Enshassi, S. Mohamed, and S. Abushaban, “Factors affecting the performance of construction projects in the Gaza Strip,” Journal of Civil Engineering and Management, vol. 15, no. 3, pp. 269–280, 2009.

[17] S. Z. H. S. Jamaludin, M. F. Mohammad, and K. Ahmad, “Enhancing the quality of construction environment by minimizing the cost variance,” in Proceeding Social and Behavioral Sciences, 2014, pp. 70–78.

[18] W. Kongsong, “The reduction of the impacts in the contract management for government construction projects,” International Journal of Applied Engineering Research, vol. 12, no. 23, pp. 13310–13313, 2017.

[19] W. Kongsong and C. Pooworakulchai, “Improving for construction contract management of government construction projects,” International Journal of Civil Engineering and Technology, vol. 9, no. 7, pp. 253–260, 2018.

[20] W. Kongsong, “The factors of the conflict in construction works,” International Journal of Engineering Research And Management, vol. 4, no. 8, pp. 14–18, 2017.