EFFICIENCY ENHANCEMENT AND REDUCING LOGISTICS COST WITH MATHEMATICAL MODEL OF AUTO PART INDUSTRY A CASE STUDY: P.E TECHNIC CO., LTD. IN PHITSANULOK PROVINCE

Authors

  • Thanida Khanongnuch Pibulsongkram Rajabhat university
  • Alongkorn Muangwai

DOI:

https://doi.org/10.14456/lsej.2021.8

Keywords:

Logistics cost, Mathematical model, Local search

Abstract

This research proposes a reduce logistics cost for production of Finite Capacity Scheduling (FCS) System for assembly flow shop with multiple common due dates. The proposed FCS system is a two-step procedure.  Firstly, it uses hierarchical dispatching rules to sequence the Jobs. Secondly, a linear programming model is used to determine the optimal start time of each operation to minimize total costs of tardiness penalty, holding cost of finished goods and work-in-process, and changeover cost, considering finite capacity of all work centers and precedence constraints of operations. A case study using real industrial problem is conducted to demonstrate the performance of the proposed FCS system.  The results show that all levels of the hierarchical dispatching rules significantly affect the scheduling performances. The LP approach can effectively determine optimal start time of each operation to get the optimal schedule based on the sequence of Jobs generated from the hierarchical dispatching rules.  Moreover, the best sequence of Jobs generated from the hierarchical dispatching rules is at least local optimal since when it is modified by local search methods, its performance cannot be improved.

References

Poonya A, Pakdaman M. Optimal control model for finite capacity continuous MRP with deteriorating items. Journal of Intelligent Manufacturing 2019;30(5):2203-2215.

Qiu Y, Wang L, Xu X, Fang X, Pardalos P. Formulations and branch-and-cut algorithms for multi-product multi-vehicle production routing problems with startup cost. Journal of Expert Systems with Applications 2018;98:1-10.

Rajendran C, Ziegler H. A performance analysis of dispatching rules and a heuristic in static flowshops with missing operations of jobs. European Journal of Operational Research (2001);131(3):622-634.

Supithak W, Liman SD, Montes EJ. Lot-sizing and scheduling problem with earliness tardiness and setup penalties. Computers & Industrial Engineering 2010;58(3):363-372.

Thailand Automotive Institute. Current situation of thai automotive industry. Bankkok: Hypernet Publisher; 2018.

The Federation of Thai Industrial. the federation of thai industrial of automotive industrial club in Thailand; 2018.

Wuttipornpun T, Yenradee P, Beullens P, Oudheusden D. A finite capacity material requirement planning system for a multistage automotive-part assembly factory. Industrial Engineering and Management Systems 2005; 4: 23-35.

Downloads

Published

2021-10-04

How to Cite

Khanongnuch, T., & Muangwai, A. . (2021). EFFICIENCY ENHANCEMENT AND REDUCING LOGISTICS COST WITH MATHEMATICAL MODEL OF AUTO PART INDUSTRY A CASE STUDY: P.E TECHNIC CO., LTD. IN PHITSANULOK PROVINCE. Life Sciences and Environment Journal, 22(2), 205–215. https://doi.org/10.14456/lsej.2021.8

Issue

Section

Research Articles