The Study of Flood Mitigation by Huay Sa-Mong Dam Project and Khlong Pra Sathueng Reservoir Project in Bangpakong–Prachin Buri River Basin

Main Article Content

Don Krue-hom
Bancha Kwanyuen

Abstract

The main purpose of this study is efficiency of flood mitigation in Bang Prakong–Prachin Buri River Basin with Huay Sa-Mong Dam and Klong Pra Sathueng Reservoir projects employing Mathematical Models. The Info Work ICM model was developed and calibrated for flood study in 2005, 2006 and 2013. The scenarios for this study are existing river system and including these reservoirs in river system. The results, discharges, were compared at 3 gauging stations; KGT.3, KGT.6 and KGT.1. As the result, the discharges at KGT.3 were decrease by 26.97, 54.31 and 37.36 m3/s in 2005, 2006 and 2013, respectively or equal to 4.88%, 9.59% and 5.12%. The discharges at KGT.6 also decreased by 24.62, 30.80 and 60.89 m3/s in 2005, 2006 and 2013, respectively or equal to 4.30%, 4.94% and 6.79%. For the last station, KGT.1, the discharges decreased by 25.27, 38.21 and 19.60 m3/s in 2005, 2006 and 2013, respectively or equal to 3.62%, 5.42%.and 2.96%. In conclusions, the study described that Huay Sa-Mong Dam and Klong Pra Sathueng Reservoirs revealed effectiveness of flood damage mitigation. However, the measure effectiveness still depends on the characteristics and distribution of rainfall in the basin. Thus, appropriate measures focusing on flood mitigation and preparedness should also be taken into account.

Article Details

Section
Engineering Research Articles

References

[1] Department of Water Resources, Ministry of Natural Resources and Environment, “Integrated plan for water resources management in Bang Pakong-Prachin Buri Basins,” Final Report (Main Report), Bangkok, Thailand. 2004 (in Thai).

[2] Department of Public Works and Town & Country Planning, Ministry of Interior, “Feasibility study and detailed design of flood protection and drainage systems of Prachinburi Province,” Master Plan Report (Main Report), Bangkok, Thailand. 2013 (in Thai).

[3] Y. Chanda, “Flood forecasting in banpakong river basin by mike 11,” M.S. thesis, Department of Water Resources Engineering, Kasetsart University, Bangkok, Thailand. 1998 (in Thai).

[4] A. Chamnanvejchakij, “Flood study in the lower Chou Phaya river basin by Mathematical Model ISIS,” M.S. thesis, Department of Water Resources Engineering, Kasetsart University, Bangkok, Thailand. 1998 (in Thai).

[5] R. Thiramanas, “Effectiveness on flood mitigation of Kaeng Sua Ten Reservoir,” M.S. thesis, Department of Water Resources Engineering, Chulalongkorn University, Bangkok, Thailand. 2004 (in Thai).

[6] N. Kampom, “The study of flood alleviation of lower Chou Phaya river basin using existing natural retention area,” M.S. thesis, Department of Water Resources Engineering, Kasetsart University, Bangkok, Thailand. 2001 (in Thai).

[7] T. Tingsanchali, “Flood plain modeling”, Ph.D. thesis, Asian Institute of Technology, Pathum Thani, Thailand, 1974.

[8] Asian Institute of Technology, Danish Hydraulic Institute and Acres International Limited, “Chao Phraya Flood Management Review,” Final Report, Pathum Thani, Thailand, 1996.


[9] T. Kim, J. Heo, D. Bae, and J. Kim, “Single-reservoir operating rules for a year using multiobjective genetic algorithm,” Journal of Hydroinformatics, vol. 10, no. 2, pp. 163–179, 2008.

[10] Department of Water Resources, Ministry of Natural Resources and Environment, Bangkok, “Increase in efficiency of the Forecasting and Warning System,” Final Report (Mathematical Model InfoWorks ICM and ICMLive Manaul), Thailand. 2016 (in Thai).

[11] Royal Irrigation Department, Ministry of Agriculture and Cooperatives, “Work Manual,” Reservoir Operation Rule Curves, vol. 9, no. 16, Bangkok, Thailand. 2014 (in Thai).

[12] L. Chen, J. McPhee, and W. W.- G. Yeh, “A diversified multiobjective GA for optimizing reservoir rule curves,” Advances Water Resources, vol. 30, no. 5, pp. 1082–1093, May 2007.