The Productivity Improvement of Bottled Water Manufacturing using Work Study Technique
Keywords:
Work study, Bottled Water, ProductivityAbstract
This research has the objectives to study and improve the productivity of bottled water manufacturing using work study technique at water factory in Chiang Mai province. After process identification with flow process chart, flow diagram, and two hand chart, we should move the work station of sticking label process from the contain water room to the raw material storage room so that reduce the transportation distance 8 meters or 10 seconds. In addition, the operation of bottle loading process was introduced for reduce the idle time of non-working hands.
Downloads
Published
Issue
Section
License
Copyright Notice articles, information, images, etc. was published in this Journal of Manufacturing and Management Technology is a copyright of the Journal of Manufacturing and Management Technology. If any person or deparment wants to bring all or part of it for publish or take any action. Authorization is required in written form from the Journal of Manufacturing and Management Technology only.