Abstract

Thailand faces persistent challenges in its labor market, notably low and declining labor productivity, labor shortages, and skill mismatches in the construction sector. Over the past decade, national development has focused more on capital investment and labor quantity than on productivity improvement. This study aims to address this gap by developing and validating a Structural Equation Model (SEM) to examine relationships among key labor productivity indicators in Thailand’s construction industry, particularly large-scale high-rise projects. Data were collected from 600 construction workers employed in residential projects across Bangkok and surrounding provinces, representing a population of 1,125,400 workers (2013–2019). The SEM incorporated nine latent constructs: Materials, Equipment/Tools, Labor, Safety, Construction Methods, Rework, Weather, Motivation, and Productivity that capture both resource-related and human-factor dimensions. The validated model demonstrated a good fit with empirical data, with all observed variable correlations significant at the 0.05 level. Motivation was identified as the most influential factor on labor productivity (total effect = 0.680), followed by Equipment/Tool performance (0.483), Labor Management (−0.049), and Resource Management/Working Conditions (−0.066). Collectively, these factors explained 92.7% of the variance in productivity. Indirect effects through Motivation accounted for 51.7% of its variation. Findings underscore the crucial role of worker motivation in improving productivity. Housing support had the most substantial positive influence on Motivation, explaining 75.7% of its variance. Construction managers should prioritize motivational strategies, particularly housing support, project-end bonuses, and social insurance, to enhance workforce satisfaction and productivity in Thailand’s construction sector.

Article Details

How to Cite
Chankampom, T., Aksorn, P., & Srinavin, K. (2026). Analysis of factors hindering labor productivity in large-scale high-rise building construction projects. Engineering and Applied Science Research, 53(1), 81–93. https://doi.org/10.64960/easr.2026.261292
Section
ORIGINAL RESEARCH

References

Zhang D, Hassan N, Carl TH. Development of an internal benchmarking and metrics model for industrial construction enterprises for productivity improvement. Can J Civ Eng. 2017;44(7):518-29. DOI: https://doi.org/10.1139/cjce-2016-0274

Chia FC, Skitmore M, Runeson G, Bridge A. Economic development and construction productivity in Malaysia. Constr Manag Econ. 2014;32(9):874-87. DOI: https://doi.org/10.1080/01446193.2014.938086

Gerges M, Ahiakwo O, Aziz R, Kapogiannis G, Saidani M, Saraireh D. Investigating and ranking labor productivity factors in the Egyptian construction industry. J Archit. 2016;5(1):44-52. DOI: https://doi.org/10.7492/IJAEC.2016.005

Sherekar V, Tatikonda M. Impact of factor affecting on labour productivity in construction projects by AHP method. Int J Eng Sci Comput. 2016;6(6):6771-5.

Hafez SM, Aziz RF, Morgan ES, Abdullah MM, Ahmed EK. Critical factors affecting construction labor productivity in Egypt. Am J Cvi Eng. 2014;2(2):35-40. DOI: https://doi.org/10.11648/j.ajce.20140202.14

Enshassi A, Sherif M, Ziad AM, Peter EM. Factors affecting labour productivity in building projects in the Gaza Strip. J Civ Eng Manag. 2007;13(4):245-254. DOI: https://doi.org/10.3846/13923730.2007.9636444

Olomolaiye A, Egbu C. Training needs in the management of human resources for knowledge management. In: Stephenson P, Greenwood D, editors. ARCOM Doctoral Workshop on Skills, Training and Development in the Construction Industry; 2005 Nov 30; Northumbria University, United Kingdom. p. 12-7.

Jarkas AM. Critical investigation into the applicability of the learning curve theory to rebar fixing labor productivity. J Constr Eng Manag. 2010;136(12):1279-88. DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000236

Fayek AR. Fuzzy hybrid computing in construction engineering and management: theory and applications. Emerald; 2018. DOI: https://doi.org/10.1108/9781787438682

Karunarathna DMTGNM, Siriwardana CSA. A tool to assess construction worker productivity. 2018 Moratuwa Engineering Research Conference (MERCon); 2018 May 30 - Jun 1; Moratuwa, Sri Lanka. USA: IEEE; 2018. p. 577-82. DOI: https://doi.org/10.1109/MERCon.2018.8421909

Muhammad NZ, Sani A, Muhammad A, Balubaid S, Ituma EE, Suleiman JH. Evaluation of factors affecting labour productivity in construction industry: a case study. Jurnal Teknologi. 2015;77(12):87-91. DOI: https://doi.org/10.11113/jt.v77.6314

Hasan A, Bassam B, Abbas E, Raufdeen R. Factors affecting construction productivity: a 30 year systematic review. Eng Constr Archit Manag. 2018;25(7):916-37. DOI: https://doi.org/10.1108/ECAM-02-2017-0035

Chigara B, Moyo T. Factors affecting labor productivity on building projects in Zimbabwe. Int J Arch Eng Constr. 2014;3(1):57-65. DOI: https://doi.org/10.7492/IJAEC.2014.005

Hwang BG, Ng WJ. Project management knowledge and skills for green construction: overcoming challenges. Int J Proj Manag. 2013;31(2):272-84. DOI: https://doi.org/10.1016/j.ijproman.2012.05.004

Thomas HR, Horman MJ. Fundamental principles of workforce management. J Constr Eng Manage. 2006;132(1):97-104. DOI: https://doi.org/10.1061/(ASCE)0733-9364(2006)132:1(97)

Shan M, Li YS, Hwang BG, Chua JE. Productivity metrics and its implementations in construction projects: A case study of Singapore. Sustainability. 2021;13(21):12132. DOI: https://doi.org/10.3390/su132112132

Hair JF, Black WC, Babin BJ, Anderson RE. Multivariate data analysis. 8th ed. UK: Cengage Learning; 2019.

Mojahed S. A project improvement system for effective management of construction projects [dissertation]. Louisiana: Louisiana University; 2005.

Umoru D, Yaqub JO. Private and public health capital expenditures in Nigeria: an empirical test of the relationship. Amer Acad Scholarly Res J. 2013;5(1):83-105.

Soham M, Rajiv B. Critical factors affecting labour productivity in construction projects: case study of south Gujarat region of India. Int J Eng Adv Technol. 2013;2(4):583-91.

Mowday RT, Porter LW, Steers RM. Employee–organization linkages: the psychology of commitment, absenteeism, and turnover. New York: Academic Press; 1982. DOI: https://doi.org/10.1016/B978-0-12-509370-5.50005-8

Vroom VH. Work and motivation. New York: Wiley; 1964.

Robbins SP, Judge TA. Organizational behavior. 18th ed. London: Pearson; 2019.

Herzberg F. Work, and the nature of man. New York: World Publishing Company; 1968.

Mayo E. The human problems of an industrial civilization. New York: Macmillan; 1933.

Attar AA, Gupta AK, Desai DB. A study of various factors affecting labour productivity and methods to improve it. IOSR J Mech Civ Eng. 2012;1(3):11-4.

Soekiman A, Pribadi KS, Soemardi BW, Wirahadikusumah RD. Factors relating to labor productivity affecting the project schedule performance in Indonesia. Procedia Eng. 2011;14:865-73. DOI: https://doi.org/10.1016/j.proeng.2011.07.110

Shashank K, Hazra S, Pal KN. Analysis of key factors affecting the variation of labour productivity in construction projects. Int J Emerg Technol Adv Eng. 2014;4(5):152-60.

Gerges M, Ahiakwo O, Aziz R, Kapogiannis G, Saidani M., Saraireh D. Investigating and ranking labor productivity factors in the Egyptian Construction Industry. J Archit. 2011;5(1):44-52.

Jergeas G. Improving construction productivity on Alberta oil and gas capital projects. A report submitted to Alberta Finance and Enterprise. Alberta: University of Calgary; 2009.

Chan P. Factors affecting labour productivity in the construction industry. In: Greenwood, editor. Proceedings of the 18th annual ARCOM conference; 2002 Sep 2-4; University of Northumbria, United Kingdom. p. 771-80.

Durdyev S, Mbachu J. On-site labour productivity of New Zealand construction industry: key constraints and improvement measures. AJCEB. 2011;11(3):18-33. DOI: https://doi.org/10.5130/AJCEB.v11i3.2120

Ameh OJ, Osegbo EE. Study of relationship between time overrun and productivity on construction sites. IJCSCM. 2011;1(1):56-67. DOI: https://doi.org/10.14424/ijcscm101011-56-67

Adamu NB, Adamu JY, Mohammed D. Prevalence of helminth parasites found on vegetables sold in Maiduguri, Northeastern Nigeria. Food control. 2012;25(1):23-6. DOI: https://doi.org/10.1016/j.foodcont.2011.10.016

Kadir MRA, Lee WP, Jaafar MS, Sapuan SM, Ali AAA. Factors affecting construction labour productivity for Malaysian residential projects. Struct Surv. 2005;23(1):42-54. DOI: https://doi.org/10.1108/02630800510586907

Jarkas AM, Bitar CG. Factors affecting construction labor productivity in Kuwait. J Constr Eng Manage. 2012;138(7):811-20. DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000501

Halwatura RU. Critical factors which govern labour productivity in building construction industry in Sri Lanka. PM World J. 2015;4(4):1-13.

Kazaz A, Manisali E, Ulubeyli S. Effect of basic motivational factors on construction workforce productivity in Turkey. J Civ Eng Manage. 2008;14(2):95-106. DOI: https://doi.org/10.3846/1392-3730.2008.14.4

Hickson BG, Ellis LA. Factors affecting construction labour productivity in Trinidad and Tobago. JAPETT. 2014;42(1):4-11.

Alaghbari W, Al-Sakkaf AA, Sultan B. Factors affecting construction labour productivity in Yemen. Int J Construct Manage. 2019;19(1):79-91. DOI: https://doi.org/10.1080/15623599.2017.1382091

Alinaitwe HM, Mwakali JA, Hansson B. Factors affecting the productivity of building craftsmen‐studies of Uganda. J Civ Eng Manage. 2007;13(3):169-76. DOI: https://doi.org/10.3846/13923730.2007.9636434

Office of Permanent Secretary for Ministry of Labour. Labour statistics yearbook 2019 [Internet]. 2019 [cited 2020 Sep 12]. Available from: https://www.mol.go.th/wp-content/uploads/sites/2/2021/01/สถิติแรงงานประจำปี-2562-ฉบับเพิ่ม-ISBN.pdf. (In Thai)

Yamane T. Statistic: an introductory analysis. 3rd ed. New York: Harper and Row; 1973.

Krejcie RV, Morgan DW. Determining sample size for research activities. Educational and psychological measurement. 1970;30(3):607610. DOI: https://doi.org/10.1177/001316447003000308

Neuman WL, Nardi PM, Berg BL, Jackson W, Varberg N, Neuman L, et al. Research methods in communication. Pearson: Canada; 2011.

Babbie ER. The practice of social research. 5th ed. Belmont: Wadsworth; 1989.

Cronbach LJ. Essentials of psychological testing. 3rd ed. New York: Harper Collins; 1970.

Li Q. A novel Likert scale based on fuzzy sets theory. Expert Syst Appl. 2013;40(5):1609-18. DOI: https://doi.org/10.1016/j.eswa.2012.09.015

Hai J, Black W, Babin B, Anderson R, Tatham R. Multivariate data analysis. Upper Saddle River: Pearson Prentice Hall; 2006.

Ghoddousi P, Poorafshar O, Chileshe N, Hosseini MR. Labour productivity in Iranian construction projects: perceptions of chief executive officers. Int J Prod Perform Manag. 2015;64(6):811-30. DOI: https://doi.org/10.1108/IJPPM-10-2013-0169

Bekr GA. Study of significant factors affecting labor productivity at construction sites in Jordan: site survey. J Eng Technol. 2016;4(1):92-7.

Malisiovas A. Construction productivity: from measurement to improvement. Advancing project management for the 21st century concepts, tools & techniques for managing successful projects; 2010 May 29-31; Heraklion, Greece. p. 1-8.

Sandbhor S, Botre R. Applying total interpretive structural modeling to study factors affecting construction labour productivity. AJCEB. 2014;14(1):20-31. DOI: https://doi.org/10.5130/AJCEB.v14i1.3753

Hashem YM, Ali SM, Dokhan SA. Factors affecting labor productivity in building projects in Great Cairo [Internet]. 2010 [cited 2020 Sep 12]. Available from: http://www.researchgate.net/publication/258100086.

Gundecha MM. Study of factors affecting labor productivity at a building construction project in the USA: web survey [master thesis]. North Dakota: North Dakota State University; 2012.

Mahamid I. Contractors perspective toward factors affecting labor productivity in building construction. Eng Constr Archit Manag. 2013;20(5):446-60. DOI: https://doi.org/10.1108/ECAM-08-2011-0074

Makulsawatudom A, Emsley M, Sinthawanarong K. Critical factors influencing construction productivity in Thailand. J KMITNB. 2004;14(3):1-6. DOI: https://doi.org/10.1061/40671(2003)6

Srinavin K, Mohamed S. Thermal environment, and construction workers’ productivity: some evidence from Thailand. Build Environ. 2003;38(2):339-45. DOI: https://doi.org/10.1016/S0360-1323(02)00067-7

Nasirzadeh F, Nojedehi P. Dynamic modeling of labor productivity in construction projects. Int J Project Manage. 2013;31(6):903-11. DOI: https://doi.org/10.1016/j.ijproman.2012.11.003

Fabrigar LR, Wegener DT. Exploratory factor analysis. Oxford: Oxford University; 2011. DOI: https://doi.org/10.1093/acprof:osobl/9780199734177.001.0001

Kline RB. Principles and practice of structural equation modeling. New York: Guilford; 2016.

Fornell C, Larcker DF. Evaluating structural equation models with unobservable variables and measurement error. J Mark Res. 1981;18(1):39-50. DOI: https://doi.org/10.1177/002224378101800104

Byrne BM. Structural equation modeling with AMOS: basic concepts, applications, and programming. 3rd ed. New York: Routledge; 2016. DOI: https://doi.org/10.4324/9781315757421

Locke EA. The nature and causes of job satisfaction. Handbook of Industrial and Organizational Psychology. 1976;1:1297-349.

Jayaweera T. Impact of work environmental factors on job performance, mediating role of work motivation: a study of hotel sector in England. IJBM. 2015;10(3):271-78. DOI: https://doi.org/10.5539/ijbm.v10n3p271

Judge TA, Thoresen CJ, Bono JE, Patton GK. The job satisfaction–job performance relationship: a qualitative and quantitative review. Psychol Bull. 2001;127(3):376-407. DOI: https://doi.org/10.1037/0033-2909.127.3.376

Organ DW, Podsakoff PM, MacKenzie SB. Organizational citizenship behavior: its nature, antecedents, and consequences. Thousand Oaks: Sage; 2005. DOI: https://doi.org/10.4135/9781452231082

Dai J, Goodrum PM. Differences in perspectives regarding labor productivity between Spanish- and English-speaking craft workers. J Constr Eng Manage. 2011;137(9):689-97. DOI: https://doi.org/10.1061/(ASCE)CO.1943-7862.0000329

Podsakoff PM, MacKenzie SB, Paine JB, Bachrach DG. Organizational citizenship behaviors: A critical review of the theoretical and empirical literature and suggestions for future research. J Manag. 2000;26(3):513-63. DOI: https://doi.org/10.1177/014920630002600307

Pinder CC. Work motivation in organizational behavior. Upper Saddle River: Prentice Hall; 1998.