A Study of Delay Factors and Preventive Guidelines in the Attitudes of Construction Contractors for Housing Projects in Bangkok and its Vicinity

Main Article Content

jaruwat panjindawan
Kittipong Suweero
วุฒิพงศ์ เมืองน้อย

Abstract

This research aims to investigate contractors’ attitudes towards factors causing construction delays and measures for prevention of construction delays in Bangkok and its vicinity. In particular, quantitative research was adopted. A questionnaire was administered to collect the data from 86 housing projects selected through simple random sampling based on Yamane’s formula for sample size determination. Statistics used to analyze the data included the relative importance index (RII) and factor analysis (FA). The results demonstrated that the three most notable factors contributing to construction delays were identified as: 1) a shortage of skilled or experienced workers; 2) delayed delivery of construction materials; and 3) changes in the prices of construction materials. In addition, all 33 factors of construction delays were thematically classified into eight categories of factors by using factor analysis (FA) as follows: 1) project and risk management; 2) labor; 3) external factors; 4) communication and coordination; 5) construction budgets; 6) construction planning; 7) contractor management; and 8) laws, regulations and contracts. Moreover, measures for prevention of construction delays are proposed to enable contractors to recognize the problems and to minimize the potential damage attributed to delays in construction

Article Details

How to Cite
panjindawan, jaruwat, Suweero, K. ., & เมืองน้อย ว. . (2023). A Study of Delay Factors and Preventive Guidelines in the Attitudes of Construction Contractors for Housing Projects in Bangkok and its Vicinity. Journal of Engineering, RMUTT, 21(2), 25–36. Retrieved from https://ph01.tci-thaijo.org/index.php/jermutt/article/view/252411
Section
Research Articles

References

Business Dictionary. What is delay definition and meaning [Internet]. 2020 [cited 2023 Feb 22]. Available from: http://www. businessdictionary.com/definition/delay.html

Agyekum-Mensah G, Knight AD. The professionals perspective on the causes of project delay in the construction industry. Engineering Construction and Architectural Management. 2017;24(5):828–41.

Assaf SA, Al-Hejji S. Causes of delay in large construction projects Int. J. Project Manage. 2006;24(4):349–57.

Arantes A, Ferreira L. Underlying causes and mitigation measures of delays in construction projects an empirical study. Journal of Financial Management of Property and Construction. 2020;25(2):165–81.

Aziz RF, Hakam A. Exploring delay causes of road construction projects in Egypt. Alexandria Engineering Journal. 2016;55(2):1515–39.

Durdyev S, Hosseini MR. Causes of delays on construction projects: a comprehensive list. International Journal of Managing Projects in Business. 2019;13(1):20–46.

Onsrisombat W. Study of factor that cause building construction delay in the northeast region [Master’s thesis]. Nakhon Ratchasima :Suranaree University of Technology;2013.

Doloi H, Sawhney A, Iyer KC, Rentala S. Analysing factors affecting delays in Indian construction projects. International Journal of project management. 2012;30:479–89.

Sambasivan M, Soon YW. Causes and effects of delays in Malaysian construction industry. International Journal of project management. 2007;25:517–26.

Yap J, Goay P, Woon Y, Skitmore M. Revisiting critical delay factors for construction analysing projects in Malaysia. Alexandria Engineering Journal. 2021;60:1717–29.

Zarei B, Sharifi H, Chaghouee Y. Delay causes analysis in complex construction projects: a Semantic Network Analysis

approach. Production Planning & Control. 2018;29(1):29–40.

Hossen MM, Kang S,Kim J. Construction schedule delay risk assessment by using combined AHP-RII methodology for an international NPP project. Nuclear Engineering and Technology. 2015;47(3):362–79.

Elhusseiny H, Nosair I, Ezeldin A. Systematic processing framework for analyzing the factors of construction projects’ delays in Egypt. Ain Shams Engineering Journal. 2021 June;12(2):1501-11.

Aziz R. Ranking of delay factors in construction projects after Egyptian revolution. Alexandria Engineering Journal. 2013;52:387–406.

Alsuliman J. Causes of delay in Saudi public construction projects. Alexandria Engineering Journal. 2019;58:801–8.