Construction Overhead Cost of Tall Buildings in Bangkok Area
Main Article Content
Abstract
Overhead cost is an important cost of total construction project cost. Appropriate control of overhead cost will avoid budget overrun problem. The objective of this research is to study the estimation method of construction project overhead cost in construction projects. The questionnaire survey was conducted on main contractors of tall buildings in Bangkok area. Overhead cost is categorized into 14 groups. The result reveals the ability level of cost control based on information from expert interview compared with actual overhead cost from construction project in the past.
Article Details
The manuscript, information, content, picture and so forth which were published on Journal of Engineering, RMUTT has been a copyright of this journal only. There is not allow anyone or any organize to duplicate all content or some document for unethical publication.
References
R.L Peurifoy. P.E. and G.D. Oberlender, 1989.P.E. Estimating construction Costs. 4th ed.: McGraw- Hill Inc.
Allan Ashworth. Cost Studies of Buildings, 1999. 3rd ed Longman.
ดิเรก ลาวัณย์ศิริ และ ปิง กุณะวัฒน์สถิต, 2538.เครื่องจักรและเทคโนโลยีในงานก่อสร้าง.พิมพ์ครั้งที่ 2. LIBRARY-NINE PUBLISHING: 3-27.
JanelJ.Adrian.,1982. Title Construction Estimating.:Prentice Hall.
นิคม ปราชญ์นกร, 2528. กฎหมายและระเบียบควบคุมอาคารพร้อมด้วยกฎหมายอื่นๆ ทีเกี่ยวข้อง. แก้ไขปรับปรุงครั้งที่ 1 วิศวกรรมสถานแห่งประเทศไทยฯ. กรุงเทพระ หน้า 601.
กำพล จันทสุนี่ย์, 2549. การศึกษาค่าอำนวยการในโครงการก่อสร้างบ้านเดี่ยว โครงการบ้านจัดสรรในเขตกรุงเทพมหานคร. วิทยานิพนธ์ ปริญญาวิศวกรรมมหาบัณฑิต สาขาวิศวกรรม และการบริหารงานก่อสร้างคณะวิศวกรรมศาสตร์มหาวิทยลัยเทคโนโลยีพระจอมเกล้ำธนบุรี: 91-95.