Application of Analytic Hierarchy Process to Select Quality Improvement for Defect Reduction Projects: A Case Study of Air Tank Manufacturer
Main Article Content
Abstract
One of the most important phase in quality improvement for defect reduction projects is the project selection phase, almost current researchers commonly use the well-known techniques such as Pareto chart, Pareto priority index, Quality control circle method and Failure mode and effect analysis. However, some of such methods consider only one kind of selection criteria like defective rate of Pareto technique or multiple criteria consideration with the equal important weight. In the case study, the quality improvement project selection must be selected base on not only the defective rate but also severity, possibility, and failure cost aspects. Therefore, this paper proposed the integration of 7 QC tools with Analytic hierarchy process techniques to select the improvement projects for defect reduction. The results of the integration of 7 QC tools with Analytic hierarchy process techniques application, the project selection result can reasonably reflect the different important weight of each selection criteria. Moreover, the defective rate of air tank painting was reduced about 2.63% that cost 9,529 Baht per month.
Article Details
The manuscript, information, content, picture and so forth which were published on Journal of Engineering, RMUTT has been a copyright of this journal only. There is not allow anyone or any organize to duplicate all content or some document for unethical publication.
References
Homkri P and Kongthana J.Design of Experiment (DOE) to Reduce Waste in Plastic Injection Process of Automation parts.Kasem Bundit Engineering Journal. 2013; 3(2): 73-95. (in Thai)
Vungkahad K and Kubtustean N.Defect Reduction in Gear Production: A Case Study of Motor Component Manufacturing. Journal of Engineering, RMUTT. 2014;12(2): 29-41. (in Thai)
Srilerd K and Kubtustean N.Waste Reduction in Induction Hardening Process: A Case Study. Journal of Engineering, RMUTT. 2016;14(2): 1-10. (in Thai)
Manowichean J and Kantanantha N.Quality Cost Reduction in Digital Camera Assembly Process. KKU Engineering Journal. 2014; 40(3): 313-322. (in Thai)
Ploychalearn K.Quality Control at Front Line QC Circle. 5th ed. Bangkok: Sor Asia Press; 2008. (in Thai)
Inhun K and Laosirihongtong T.Prioritization of Failure Modes by Using Fuzzy Analytic Hierarchy Process (FAHP): A Case study Electronics Parts / Components Manufacturing. The journal of KMUTNB. 2016 26(23): 427-436. (in Thai)
Satty. T. L.The Analytic Hierarchy Process. New York: McGraw-Hill; 1980
Tunsirikongkol W. AHP The Most Famous Decision Process in the World. Bangkok: Graphic and Printer Center; 1999. (in Thai)