A Standard Time Study of Install the Paint Mold : A Case Study of Magnetic Annex Supply Partnership

Main Article Content

Kittichai Athikulrat

Abstract

This research aims to improve a mold setup process and determine the standard time for installing the paint Mold. By studying the Mold Installation by focusing on a work study of Man-Machine with analyzing non-value added activities by using 5W1H questions as well as applying ECRS concept in order to improve the setup process. After the process has been improved by eliminated non-value added activities, the activities of setting up the printing machine have been reduced from 13 activities to 6 activities, the time of a mold setup was reduced from 76.99 minutes to 52.42 minutes, 57.13% time decreased. After that, find out the standard time by employing stopwatch and counting suitable numbers with the 95% confidence interval and ± 10% tolerance. The result shows that normal time and standard time are 56.613 minutes and 65.105 minutes. 

Article Details

How to Cite
Athikulrat, K. . (2019). A Standard Time Study of Install the Paint Mold : A Case Study of Magnetic Annex Supply Partnership. Journal of Engineering, RMUTT, 17(1), 77–90. Retrieved from https://ph01.tci-thaijo.org/index.php/jermutt/article/view/241932
Section
Research Articles

References

Rijiravanich V. Work study : principle and case study. 4th Chulalongkorn University Press. 2548. (In Thai)

Athikulrat K. Productivity improvement by fundamental of hand motions : a case study of assembly line in an electronics company. RMUTP Research Journal.2017,11(1):165-176. (In Thai)

Sangdeun K, Pornsingh C, Wattanasangsuk A. Productivity improvement with line balancing technique by genatic algorithm. In proceeding of 7th Nation Conference of Industrial Engineering Network, 2007 Oct 24-26; Petchaburi. 685-692.

Athikulrat k, Pakpoom P. Application of lean manufacturing system to increase productivity : case study of U.P.S. Industrial Co., Ltd. Journal of Science and Technology. 2017.6(3).13-26. (In Thai)

Moungmoon K, Kartea N, Chaikumpun M. The standard time study of carton corrugated production : case study ruengchana packing limited partnership. Kasem Bundit Engineering Journal. 2016.6(1):107-121. (In Thai)