A Standard Time Study of Install the Paint Mold : A Case Study of Magnetic Annex Supply Partnership
Main Article Content
Abstract
This research aims to improve a mold setup process and determine the standard time for installing the paint Mold. By studying the Mold Installation by focusing on a work study of Man-Machine with analyzing non-value added activities by using 5W1H questions as well as applying ECRS concept in order to improve the setup process. After the process has been improved by eliminated non-value added activities, the activities of setting up the printing machine have been reduced from 13 activities to 6 activities, the time of a mold setup was reduced from 76.99 minutes to 52.42 minutes, 57.13% time decreased. After that, find out the standard time by employing stopwatch and counting suitable numbers with the 95% confidence interval and ± 10% tolerance. The result shows that normal time and standard time are 56.613 minutes and 65.105 minutes.
Article Details
The manuscript, information, content, picture and so forth which were published on Journal of Engineering, RMUTT has been a copyright of this journal only. There is not allow anyone or any organize to duplicate all content or some document for unethical publication.
References
Rijiravanich V. Work study : principle and case study. 4th Chulalongkorn University Press. 2548. (In Thai)
Athikulrat K. Productivity improvement by fundamental of hand motions : a case study of assembly line in an electronics company. RMUTP Research Journal.2017,11(1):165-176. (In Thai)
Sangdeun K, Pornsingh C, Wattanasangsuk A. Productivity improvement with line balancing technique by genatic algorithm. In proceeding of 7th Nation Conference of Industrial Engineering Network, 2007 Oct 24-26; Petchaburi. 685-692.
Athikulrat k, Pakpoom P. Application of lean manufacturing system to increase productivity : case study of U.P.S. Industrial Co., Ltd. Journal of Science and Technology. 2017.6(3).13-26. (In Thai)
Moungmoon K, Kartea N, Chaikumpun M. The standard time study of carton corrugated production : case study ruengchana packing limited partnership. Kasem Bundit Engineering Journal. 2016.6(1):107-121. (In Thai)