Reclamation project of a Brownfield site at Rio de Janeiro State, Brazil
Main Article Content
Abstract
The paper presents the geotechnical solution proposed for remediation and further redevelopment of a Brownfield site from a bankrupted zinc processing industry. All installations were abandoned without a post closure technical plan, including a 1.2 million cubic meters mineral waste pile inside a 260,000 m2 liquid waste pond. Both structures were settled upon a soft clay deposit contaminated with Zn and Cd. The technical solution proposed involved the complete drainage of the liquid pond, accompanied by on site treatment, a hydraulic barrier of pump & treat wells and the construction of an engineered waste containment facility using the mineral solid waste as compacted earth fill material combined to geosynthetic products.
Article Details

This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Copyright © 2019 Association of Geotechnical Societies in Southeast Asia (AGSSEA) - Southeast Asian Geotechnical Society (SEAGS).