Design and Construction of Ho Chi Minh City Metro Line 1 Underground Section (Contract Package 1b)

Main Article Content

Masrur Abdull Hamid Ghani
Kenichi Ito
Minoru Kurik
Shun Sugawara

Abstract

Contract Package 1b (CP1b) is a part of Ho Chi Minh City Metro Line 1 (HCMC MRT Line 1) project which consists of underground construction of two stations, bored tunnels, cut-and-cover tunnel, and transition structure. Each structure has its own distinctive features due to its geographical condition, underlying geotechnical condition and construction constrain. Opera House Station, whose construction method categorized as deep excavation (up to 30 m depth) is the first underground metro station in Vietnam which is situated in a cramped downtown and surrounded by old-sensitive shallow-founded buildings. It was built by top-down method as the method offers better control of retaining wall deformation to minimize settlement of adjacent buildings. The other station, Ba Son Station, located next to the riverside, was protected by double sheet pile structure during its construction. For cut-and-cover tunnel, the rigid steel pipe sheet pile (SPSP) was used to maintain stability for construction in the river and on the weak alluvium clay soil. The underlying alluvium clay layers also cause a negative skin friction issue in the design of pile for the transition structure in Ba Son area. As for tunneling beneath the city, the bored tunnel using Earth Pressure Balance (EPB) Tunnel Boring Machine (TBM) was selected. The TBM was launched from Ba Son Station toward Opera House Station twice: one for the east-bound track, and the other is for the west-bound track. In this project, several instruments were deployed to monitor and to ensure the safety of construction works and surrounding buildings. The data from the monitoring works were also useful for back analyzing and reconfiguration of the construction method. Those features brought challenges for both design and construction stages. The design and construction experience of the project are shared in this paper.

Article Details

How to Cite
Masrur Abdull Hamid Ghani, Kenichi Ito, Minoru Kurik, & Shun Sugawara. (2023). Design and Construction of Ho Chi Minh City Metro Line 1 Underground Section (Contract Package 1b). Geotechnical Engineering Journal of the SEAGS & AGSSEA, 51(1), 1–7. https://doi.org/10.14456/seagj.2020.58
Section
Research Papers