[1]
suwit saisuthanawit, “Engineering Economic Value Analysis of Interlocking Block Pilot Plant Using Mae Moh Power Plant Bottom Ash”, NUEJ, vol. 13, no. 2, pp. 80–98, Dec. 2018.