Phuk-in, Adul. “Solving the Scheduling Problem of Stainless Steel and Alloy Factory: A Case Study of Stainless Steel and Alloy Factory in Uttaradit Province”. Engineering and Technology Horizons 41, no. 4 (December 25, 2024): 410408. accessed September 10, 2026. https://ph01.tci-thaijo.org/index.php/lej/article/view/258258.