ถาวงษ์กลาง ก. and ตันวาณิชกุล ล. (2020) “Application of Production Scheduling Technique for Dispatching Ready Mixed Concrete. ”, Engineering and Technology Horizons , 33(4), pp. 60–66. Available at: https://ph01.tci-thaijo.org/index.php/lej/article/view/241391 (Accessed: 19 May 2024).