(1)
Bilee, R. .; Pitaksringkarn, J. . A Study of Efficiency and Economic Value of Grade Separated Construction Project: Case Study of Grade Separated Without Ramp across The Sri Ayutthaya Intersection Bangkok. Eng. & Technol. Horiz. 2024, 41, 410107.