[1]
Bilee, R. and Pitaksringkarn, J. 2024. A Study of Efficiency and Economic Value of Grade Separated Construction Project: Case Study of Grade Separated Without Ramp across The Sri Ayutthaya Intersection Bangkok. Engineering and Technology Horizons . 41, 1 (Mar. 2024), 410107. DOI:https://doi.org/10.55003/ETH.410107.