[1]
R. Wongthong, T. Khuenkaew, A. Nommanas, P. Jiandon, P. Baowan, and C. Kulliap, “Reducing Changeover Time in the Plastic Injection Process: Case Study”, J. Manuf. Manage. Technol., vol. 4, no. 1, Jun. 2025.