[1]
Wongthong, R. , Khuenkaew, T. , Nommanas, A. , Jiandon, P. , Baowan, P. and Kulliap, C. 2025. Reducing Changeover Time in the Plastic Injection Process: Case Study. Journal of Manufacturing & Management Technology. 4, 1 (Jun. 2025).