Hardi Saputra, C. G. P., Deni, D. P., Alfianarrochmah, ’Ilma, Kurnianingsih, O., Rahmi, A. T., Pratiwi, K. H., Susanto, T., Legowo, S. J., Yanto, F. H., Pratama, R. W. and Halimah, R. S. N. (2024) “Application of 5D building information modeling using Cubicost in estimating construction structure work costs (Case study: Emergency Room and Hemodialysis Building at Waras Wiris Local General Hospital of Boyolali, Indonesia)”, Engineering and Applied Science Research, 51(3), pp. 276–285. Available at: https://ph01.tci-thaijo.org/index.php/easr/article/view/253983 (Accessed: 20 May 2024).