Sukto, S. and Charnsethikul, P. (2015) “A Hybrid of List-Scheduling and ColumnGeneration for Scheduling of n JobGroups through m Identical Parallel Machines with Minimum Makespan”, Engineering and Applied Science Research, 32(2), pp. 237–250. available at: https://ph01.tci-thaijo.org/index.php/easr/article/view/42391 (accessed: 31 August 2026).