HARDI SAPUTRA, C. G. P.; DENI, D. P.; ALFIANARROCHMAH, ’Ilma; KURNIANINGSIH, O.; RAHMI, A. T.; PRATIWI, K. H.; SUSANTO, T.; LEGOWO, S. J.; YANTO, F. H.; PRATAMA, R. W.; HALIMAH, R. S. N. Application of 5D building information modeling using Cubicost in estimating construction structure work costs (Case study: Emergency Room and Hemodialysis Building at Waras Wiris Local General Hospital of Boyolali, Indonesia). Engineering and Applied Science Research, [S. l.], v. 51, n. 3, p. 276–285, 2024. Disponível em: https://ph01.tci-thaijo.org/index.php/easr/article/view/253983. Acesso em: 20 may. 2024.