Hardi Saputra, C. G. P., Deni, D. P., Alfianarrochmah, ’Ilma, Kurnianingsih, O., Rahmi, A. T., Pratiwi, K. H., Susanto, T., Legowo, S. J., Yanto, F. H., Pratama, R. W., & Halimah, R. S. N. (2024). Application of 5D building information modeling using Cubicost in estimating construction structure work costs (Case study: Emergency Room and Hemodialysis Building at Waras Wiris Local General Hospital of Boyolali, Indonesia). Engineering and Applied Science Research, 51(3), 276–285. Retrieved from https://ph01.tci-thaijo.org/index.php/easr/article/view/253983