[1]
Sukto, S. and Charnsethikul, P. 2015. A Hybrid of List-Scheduling and ColumnGeneration for Scheduling of n JobGroups through m Identical Parallel Machines with Minimum Makespan. Engineering and Applied Science Research. 32, 2 (Nov. 2015), 237–250.