A Plant Layout Improvement to Increasing Productivity: A Case Study Downlight Manufacturer

Main Article Content

Patomphong Homsri

Abstract

   The purpose of the study is to improve factory’s layout and production process, leading to the more effective processes of downlight lamp and to reduce cost. Because of the long distance and duration of transferring materials, the bottleneck process caused the delay. The study covers the analysis of the sample factory’s need and problems, using systematic layout planning, collecting fundamental information of each department such as duration and distance for transferring materials, cycle of customers’ needs for balancing assembly line, designing and setting out the factory, and adjusting the process and balance of assembly lines. The consequences of improving the factory reveal the reduced distance in transferring materials by 33 meters or 27.04% and the reduced duration by 43 minutes or 24.57% accordingly. Moreover, the results of improvement in balancing assembly line by using ECRS show the reduction of cycle time in assembly lines by 64.08 seconds to 61.36 seconds, total of reduced cycle time is 2.7 seconds or 4.24%. The productivity has been increased from 2,234 to 3,037 per day. The total increased output is 803 pieces or 35.94% per day and reduce 2 from 10 workers or 25%. These lead to the ability of the factory to support the increasing purchased orders from customers in the future properly.

Article Details

Section
Research Article

References

Bank of Thailand. “The pandemic represents a rare but narrow window of opportunity to reflect, reimagine, and reset our world.” BOT.or.th. https://www.bot.or.th/Thai/BOTMagazine/Pages/256303_CoverStory.aspx (accessed Jun. 10, 2021).

V. Watcharodomprasert, “Competitive environment facters in the current situation,” J. Thonburi Univ., vol. 8, no. 17, pp. 127–134, 2014.

C. Pornsing, S. Amphutsa, J. Kanchana-anothaiand, and P. Tharawetcharak, “Process and plant layout Improvement using industrial engineering techniques: A case study sample LED light factory,” Thai Sci. Technol. J., vol. 27, no. 6, pp. 1132–1146, Jul. 2018.

T. Dankhate, T. Sae-Lee, and C. Pattayanon, “Line balancing for reducing waste of producing: A case study frozen salmon process,” in 35th Conf. Ind. Eng. Netw., Ubon Ratchathani Univ., Ubon Ratchathani, Thailand, Jul. 23–26, 2017, pp. 23–28.

P. Chopradab, W. Niyomwet, K. Pleumjit, and A. Apirakpongsa, “Plant layout improvement to increase productivity in a printing plant,” Adv. Sci. J., vol. 13, no. 1, pp. 120–125, 2013.

P. Wanichpongpan, B. Kirdmanee, P. Ngaothaisong, M. Srisawan, and K. Khumsuwan, “Improvement production line of air pipe car,” J. Thonburi Univ., vol. 2, no. 1, pp. 7–18, Jan. 2008.

C. Srisupinanon, Plant Layout Design. Bangkok, Thailand: I Group Press (in Thai), 2012.

P. Homsri, A. Krairit, and P. Visuwan, “An application of Toyota production system: A case study of automotive fuel tank manufacturer,” J. Eng., RMUTT, vol. 1, no.10, pp. 11–24, Jun. 2012.

C. Thavornwat, K. Jongwuttanaruk, V. Chevaviriyanoon, and R. Sangkatip, “Plant layout improvement: Case study of machinery parts plant.” in Proc. 32th Ind. Eng. Netw. Conf., Samutprakan, Thailand, Oct. 30–31, 2014, pp. 51–58.